Data center
Explore a 500 kW IT scenario without treating export capacity as permission to import power.
0,5 MW ITIT capacityOpen sample report →Eight routes · frozen synthetic calculations · honest evidence gaps
See how PV8 moves from an operating PV asset to a route-specific decision, a visual evidence trail and a package the customer can continue in its normal engineering workflow.
Explore a 500 kW IT scenario without treating export capacity as permission to import power.
0,5 MW ITIT capacityOpen sample report →Test two 150 kW chargers against demand, capital cost and the separate import-rights question.
300 kWInstalled charging powerOpen sample report →Compare the existing array with a module replacement scenario; physical fit remains subject to engineering review.
4000 kWpExisting PVOpen sample report →Explore a lease on a selected hectare; an illustrative payment is not a market offer or permission to remove PV.
10.000 m²Selected areaOpen sample report →A nearby industrial site is a lead to investigate, not a qualified electricity buyer.
1 sitesIllustrative nearby leadsOpen sample report →Explore agricultural income on one selected hectare without asserting that a crop, machine or permit already fits.
1 haScreened agricultural areaOpen sample report →A synthetic site boundary and assumed wind speed demonstrate the screen, not a permitted turbine location.
2,4 MWWind capacityOpen sample report →Quantify recorded connection utilisation while keeping export rights, import rights and hypothetical strategies separate.
3500 kWRecorded export limitOpen sample report →