SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
PV8.ai

Wind–PV hybridization

Żary Pole PV · Lubuskie, PL · 40 MWp · COD 2015 · auction CfD to 2030

3 TURBINES FIT THE FENCE

Three 3.6 MW turbines sited around the array lift connection use to 71% and add 24 GWh/yr, filling winter and night hours PV leaves empty.

3 × 3.6 MWTurbines placedinside the site fence
24 GWh/yrAdded outputnet of wake
48% → 71%Connection useannual load factor
700 m PLSetback screen1 WTG flagged

Grid-connection utilisation

PV only
PV + wind hybrid

% annual use (indexed)

Evidenced

  • Turbine positions against the site boundary
  • Wake-adjusted yield at the entered wind speed
  • Poland 700 m dwelling-setback layout scan

Still needed to advance

  • A measured wind campaign or ERA5 calibration
  • Environmental (avian/noise) study
  • Grid code compliance for the hybrid plant

Turbines are placed around the PV you keep and screened against the country's real dwelling setback, so the layout you see is one that could actually be permitted.

What you get inside PV8

This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:

Interactive site layout

Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live

Cadastral & parcels

WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number

Bankable financial model

1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable
🔒 Post-tax project finance — DSCR, gearing, equity IRR, export to Excel