SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
3 TURBINES FIT THE FENCEThree 3.6 MW turbines sited around the array lift connection use to 71% and add 24 GWh/yr, filling winter and night hours PV leaves empty.
3 × 3.6 MWTurbines placedinside the site fence
24 GWh/yrAdded outputnet of wake
48% → 71%Connection useannual load factor
700 m PLSetback screen1 WTG flagged
Grid-connection utilisation
PV only
PV + wind hybrid
% annual use (indexed)
Evidenced
- Turbine positions against the site boundary
- Wake-adjusted yield at the entered wind speed
- Poland 700 m dwelling-setback layout scan
Still needed to advance
- A measured wind campaign or ERA5 calibration
- Environmental (avian/noise) study
- Grid code compliance for the hybrid plant
Turbines are placed around the PV you keep and screened against the country's real dwelling setback, so the layout you see is one that could actually be permitted.
What you get inside PV8
This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:
Interactive site layout
Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live
Cadastral & parcels
WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number
Bankable financial model
1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable
🔒 Post-tax project finance — DSCR, gearing, equity IRR, export to Excel