Illustrative example · synthetic plant and assumptions
PV8

Grid value and connection strategy

PV8 demonstration solar plant, IT · 4 MWp · synthetic inputs

Needs confirmation

Recorded export use can be screened, while import capacity and time-resolved headroom remain deliberately unknown.

Recorded export limit
3500 kW
Synthetic inputs
Annual utilisation
14,4 %
Synthetic inputs
Recorded import limit
Not established
Evidence or inputs required
Why

IMPORT RIGHT NOT ESTABLISHED

Compare the scenario with its baseline

Recorded export limit
3500 kW

Recorded import limit: not established

Why

This example does not establish a complete annual investment model. Required inputs remain visible in your workspace.

Export and import are separate contractual rights. Annual energy cannot establish hourly connection headroom.

Report copy is presented in the selected language where available; some technical labels remain in English. Figures use the IT edition’s EUR convention.

Illustrative inputs

  • Synthetic 4 MWp plant: 16,000 modules × 250 Wp.
  • 4,400 MWh/year generation and 8 ha site area are illustrative inputs.
  • No grid import agreement, customer contract or surveyed layout is supplied.

Three next steps

  • Confirm the connection agreement and operational restrictions.
  • Provide interval export and import data before claiming hourly headroom.
  • Discuss the proposed strategy with the network operator.
SCREENING EVIDENCE PACKAGE · NO SLD

Engineering handoff package

An electrical SLD would not describe this route. PV8 hands over its decision basis and evidence requests; the customer keeps the JSON snapshot and can carry verified site data into its normal land, planning or grid workflow.

  • Connection-rights and interval-data request schedule
  • Export/import evidence register
  • Calculation snapshot JSON and checksum
Download the screening evidence · JSON
01Evidence
02Schedules
03Lineage
Built for review and continuation in the customer’s engineering workflow.

Use this example to see the decision process. Your own result depends on your plant, assumptions and evidence; it is not a financing approval.

Explore this route in PV8

Rights and signals

Separate contracted rights from public capacity publications.

What-if strategies

Model an informal proposal without presenting it as authorised.

Connection use

Identify the evidence needed for a network discussion.

Calculation basis

Generated offline with PV8 engine code. No customer information or live provider response is included. Financial figures use EUR. Rebuild recipe: scripts/build_public_sample_snapshots.py.

Snapshot SHA-256: 5194cbfa558631d9bbe2881aa28e96f243cd3a3bb1e9c63b3d089d7c092845c3

{
  "schema": "pv8.public_samples/1",
  "slug": "grid",
  "country": "IT",
  "currency": "EUR",
  "sha256": "5194cbfa558631d9bbe2881aa28e96f243cd3a3bb1e9c63b3d089d7c092845c3",
  "recipe_sha256": "6336621d4d7dd98e4d258b757e006f2dad71c51d6d5a7fda73afb56d034eef41",
  "engine_revision": "72dd52fcb5e8ade19adb205ee3e46a139cc349fa"
}

Download the complete calculation JSON