SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
DEFEND THE TRANSPORT RIGHTA use-it-or-lose-it review is likely; the utilisation pack shows 61% use and a credible fill plan that protects the 40 MVA right.
40 MVAContracted capacityat the POI
61%Utilisationannual, metered
≤15 MVAAt riskif unfilled
BESS + windFill plancredible headroom use
Connection capacity — used vs defensible
Currently used
With the fill plan
% of 40 MVA
Evidenced
- Contracted capacity from the connection agreement
- Metered utilisation over 12 months
- Public congestion signals for the area
Still needed to advance
- The operator's review criteria and deadline
- Board sign-off on the fill investments
- Any queued third-party requests on the POI
PV8 separates rights from public signals and produces the utilisation proof and fill plan in one pack — the evidence the operator actually asks for.
What you get inside PV8
This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:
Interactive site layout
Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live
Cadastral & parcels
WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number
Bankable financial model
1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable
🔒 Post-tax project finance — DSCR, gearing, equity IRR, export to Excel