SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
PV8.ai

Modular data centre co-location

Meadowbank Solar · Lincolnshire, UK · 48 MWp · COD 2014 · ROC expiring 2027

PROMISING

A 12 MW modular data hall fits the spare land and idle export headroom, adding an estimated £3.1M/yr of rent against 4.2% of displaced PV.

12 MWRentable IT loadon 3.1 ha of set-aside land
4.2%PV displaced1.9 GWh/yr, priced in
£3.1M/yrIndicative rentat £260/kW-month
18 MVAGrid headroom usedof 22 MVA idle at night

Annual site value — merchant PV only vs PV + data hall

Merchant PV only
PV + modular data hall

£ / year (indexed)

Evidenced

  • Export capacity and connection voltage from the DNO agreement
  • Set-aside land area from the uploaded site boundary
  • PV generation profile from 3 years of metered output

Still needed to advance

  • A signed data-centre offtake or colocation LOI
  • Water/cooling availability and permit path
  • Ground conditions for the hall foundation

The engine sizes the hall against the connection you actually hold and prices the PV you would sacrifice, so the rent has to beat a real generation number — not a blank field.

What you get inside PV8

This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:

Interactive site layout

Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live

Cadastral & parcels

WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number

Bankable financial model

1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable
🔒 Post-tax project finance — DSCR, gearing, equity IRR, export to Excel