SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
PROMISINGA 12 MW modular data hall fits the spare land and idle export headroom, adding an estimated £3.1M/yr of rent against 4.2% of displaced PV.
12 MWRentable IT loadon 3.1 ha of set-aside land
4.2%PV displaced1.9 GWh/yr, priced in
£3.1M/yrIndicative rentat £260/kW-month
18 MVAGrid headroom usedof 22 MVA idle at night
Annual site value — merchant PV only vs PV + data hall
Merchant PV only
PV + modular data hall
£ / year (indexed)
Evidenced
- Export capacity and connection voltage from the DNO agreement
- Set-aside land area from the uploaded site boundary
- PV generation profile from 3 years of metered output
Still needed to advance
- A signed data-centre offtake or colocation LOI
- Water/cooling availability and permit path
- Ground conditions for the hall foundation
The engine sizes the hall against the connection you actually hold and prices the PV you would sacrifice, so the rent has to beat a real generation number — not a blank field.
What you get inside PV8
This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:
Interactive site layout
Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live
Cadastral & parcels
WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number
Bankable financial model
1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable