SAMPLE REPORT · demonstration data on a theoretical asset · figures are real methodology on illustrative inputs
PV8.ai

Solar-powered irrigation

Konya Ova PV · Konya, TR · 16 MWp · COD 2017 · YEKDEM to 2027

REVIVE THE SCHEME

PV production aligns with the summer pumping peak; supplying the district scheme offsets €0.42M/yr of diesel and grid pumping.

88%Peak matchPV vs pumping demand
€0.42M/yrPumping offsetdiesel + grid avoided
1,900 haArea serveddistrict scheme
screenedWater reusetreatment demand mapped

Summer pumping energy — cost basis

Diesel + grid
PV-supplied

€ (indexed, lower is better)

Evidenced

  • PV production profile against seasonal pumping
  • Nearby scheme and demand from the water map
  • Legacy scheme status and revival candidacy

Still needed to advance

  • The scheme operator's metered demand
  • Water rights and reuse permits
  • Pump-station electrical interface

PV8 matches production to irrigation, pumping, treatment and reuse — including legacy schemes worth bringing back — so the value rests on real seasonal demand.

What you get inside PV8

This sample shows the headline. In your workspace each route opens into interactive, evidenced deliverables:

Interactive site layout

Turbine T3moved · +2.1 GWh
Spacing5.2 D · OK
🔒 Drag turbines & panels — PV8 re-runs layout, spacing & output live

Cadastral & parcels

WTG-01parcel 1428/3
WTG-02parcel 1428/7
WTG-03parcel 1431/2
Cable route4 parcels
🔒 Every turbine & parcel matched to its cadastral number

Bankable financial model

1.38×min DSCR
68%gearing
14.2%equity IRR
DSCR sculptlender-ready
ExportExcel · shareable
🔒 Post-tax project finance — DSCR, gearing, equity IRR, export to Excel